Steelforce worked with McConnell Dowell on the MCG Concourse Extension project in 2008/9. They were employed through GFC Industries, and interfaced with McConnell Dowell through both the design and construction face. Their Attention to detail, toghether with consideration of the construction restrictions and requirement was excellent. They were proactive and flexible, proposing change or alternate solutions as needed, and worked meticuously through each element on a complex engineering structure. I would highly recommend the service that Steelforce provides and look forward to working with them on future projects
David GeeConstruction Manager, MCG Concourse Extension
Civil & Marine
A very professional and courteous company to deal with. Our company have a first-class association with Steelforce Industry Solutions and look forward to this continuing long into the future.
Vicky JardineJards & Co Pty Ltd
As the structural engineer on this design and construct project, I would like to thank you for your assistance throughout the shop detailing process. The time constraints were very onerous and we were all under a great deal of pressure. Your professional approach to shop detailing within this pressure environment greatly assisted the progress of the project. Due to the nature of the project, the design was still evolving throughout the shop detailing process and instead of being obstructive through this difficult period, you were proactive in assisting us to develop and optimized solution. Many thanks for your assistance on this project and we look forward to working with you again in the near future.
Michael WebbAssociatte Director
Burns Hamilton and Partners Pty Ltd
Steel Force worked with Suters Architects on the new state-of-the-art $23m aquatic facility at Noble Park completed in 2012. Steel Force use of 3D technology and attention to detail ensured a high level of coordination with the architectural and services designs, significantly reduced the volume of steel related RFI’s and on site steel rectification work. This meant that the framing could be erected much sooner than the Head Contractor had initially programmed. I have no hesitation recommending Steel Force to any builder that demands a high degree of accuracy and coordinated steel drawings.
Clinton WynerSenior Project Architect and Associate at Suters Architects
Dardo and Darren were a pleasure to work with. They grasped the intended Architectural concepts and as architects we were able to work collaboratively with them. The documentation was excellent which resulted in an extremely high standard of steelwork being delivered to site. Despite a façade of complex curves there were no fitment issues experienced by the Contractor on site and this is testament to Steelforce’s dedication to their trade.
Brett DiproseAssociate RAIA
Peddle Thorp Architects
Dardo, thank you for the steel drafting and modelling SteelForce completed for MFJ Constructions for the Mt Aitken Water Pump Station Building. Your eye for detail during the initial setup and modelling of the project paid off on site with no delays experienced during the structural steel erection. I would have no hesitation using/recommending SteelForce in future on similar projects. Thank you for all your great work.
Louis VelardiProject Engineer
MFJ Constructions (Vic) Pty Ltd